Product line 04 / 12 · Power Distribution
One 3U panel that feeds the whole rack: nine 220 VAC outlets, conditioned +5 / +12 / −12 / +24 VDC rails, load switch, circuit breaker and emergency stop — engineered as a 19″ module, not an afterthought.
C-BOX builds power distribution as a proper rack module. Our 3U PDU houses everything the electrical side of a system needs in one finned 481 × 482.7 × 132.9 mm chassis: a load switch with OFF-position locking, a double-pole circuit breaker, an emergency stop and nine fuse-protected 220 VAC outlets — plus a conditioned low-voltage section delivering +5 V, +12 V, −12 V and +24 V rails for the electronics in the rack. The low-voltage-controls-high-voltage circuit concept keeps the operator side safe, and every unit is wired, labelled and function-tested in our workshop before it ships. 1U and 2U variants and custom outlet mixes are built to order.
| Height | 3U (1U / 2U variants on request) |
| Dimensions | 481 × 482.7 × 132.9 mm, side cooling fins |
| Input | C19 16 A · 115 / 250 VAC · 50 / 60 Hz |
| AC outputs | 9 × 220 VAC, ≥ 3500 W total |
| DC outputs | +5 V ≥ 32.5 W · ±12 V ≥ 120 W · +24 V ≥ 240 W |
| Front panel | load switch (OFF lock) · double-pole MCB · e-stop · fuse · status LEDs |
| Environment | −20…+60 °C operating · −40…+65 °C storage |
| Weight | approx. 9.05 kg |
The PDU suite comes in 1U / 2U / 3U heights on one common platform. 3U shown below; 1U and 2U variants share the same front-panel philosophy — photos and drawings on request.
Finned-aluminium 3U chassis — nine 220 VAC outlets, +5 / ±12 / +24 VDC rails, load switch with OFF lock, double-pole MCB and emergency stop on the front panel.


Same interface dimensions as the nVent SCHROFF equivalents — our own tooling, material and finish.
Every model has its own page with specifications and RFQ. Use your browser search (Ctrl/Cmd+F) on this page, or send us the number and we will quote it.
A rack PDU is a distribution board in 19″ format. What matters is not the outlet count on the front but the input rating, the protection device upstream, and whether the outlets are grouped the way the load is grouped.
| Element | What to specify | Why it decides the part |
|---|---|---|
| Input | single-phase 230 V or three-phase, cable length and plug type | the plug and cable are usually the longest lead item |
| Protection | MCB per group, curve B or C, RCD if required by site rules | a 16 A group should not be loaded above about 80% continuously |
| Outlets | IEC C13 / C19 count and grouping | group by equipment pair, not by physical position, so one trip does not take both feeds |
| Metering | per-PDU or per-outlet, local display | per-outlet metering is what makes capacity planning possible |
| DC rails | voltages, current per rail, isolation | a PDU with DC rails is a power supply as well as a distributor |
| Mounting | 3 U horizontal, or vertical zero-U | horizontal takes rack height, vertical takes depth beside the rails |
A PDU dissipates heat like any other equipment: a 3 kW loaded PDU with 98% efficiency puts roughly 60 W into the rack air. That is small against a full rack but not negligible in a closed cabinet, and it is why PDUs are usually mounted low, where the intake air is coolest. Continuous loading above 80% of the breaker rating shortens the breaker life and, in a warm rack, causes nuisance trips.
For anything with a metal chassis and a mains input, the earth path is part of the product, not an installation detail: the PDU frame must bond to the cabinet, and the cabinet to the building earth, with a measurable low-resistance path. If the site requires an RCD, state the residual current and whether it is per-PDU or per-rack — it changes the input assembly.
Where this product line is typically used.
Parts that usually go together with Power Distribution Units (PDU).
Related categories
Nine AC 220 V outlets with AC throughput of at least 3500 W, on a C19 16 A input, 115 / 250 VAC, 50 / 60 Hz, rated -20 to +60 C. The chassis is 481 x 482.7 x 132.9 mm with cooling fins on both sides.
+5 V, +12 V, -12 V and +24 V rails feed the electronics inside the rack. The low-voltage-controls-high-voltage design keeps the operator side safe, and every unit is wired, labelled and function-tested before shipment.
Yes. 1U and 2U variants and custom outlet mixes are built to order, with load switch and OFF-position locking, double-pole breaker and emergency stop on the front panel.
Made in our own plants — chassis and precision parts from Kunshan, cabinets and surface finishing from Hefei: CNC punching, press braking, CNC machining, assembly, inspection and export packing in-house.
Kunshan plant →Hefei plant →Cross-referencing against major international 19″ system part numbers is our daily routine — we quote within 24 hours for standard items.
Every part below follows the same interface dimensions as the standard 19″ subrack system, so it fits existing installations without rework. If your drawing or BOM lists an 8-digit order number, send it over — we will confirm the equivalent C-BOX part, lead time and price.